Category: World
Edgware District Line Branch Closed Saturday

Edgware District Line Branch Closed Saturday

Barnet ranked 10th most peaceful London borough

Barnet ranked 10th most peaceful London borough

Barnet FC loses 1-3 to Swindon Town

Barnet FC loses 1-3 to Swindon Town

2/4
/World//4 min read

Enfield Town Liveable Neighbourhood scheme paused pending review

Transport for London funding for next phase is on hold as council re-evaluates project elements.

Trust 74Craft 95Hype 30How this was reported ▾
Trust74/100

Trust 74: named council, officials and TfL statements plus specific £3.65 m figure and date support the claim.

How well corroborated and evidenced the reporting is. Higher is better.

Craft95/100

Critic 95: clear impact explanation, multiple quotes, specific streets and figures, and next steps outlined.

Context, balance and separation of fact from comment. Higher is better.

Hype30/100

Hype 30: measured language with mild emphasis; headline matches article without sensational exaggeration.

How far presentation runs ahead of substance. Lower is better.

1 source assessed · methodology

By Barnet Press News DeskAI-assisted, editor-supervised • Barnet Press
Published: Barnet Edition • Verified local news
Share Story:
Enfield Town Liveable Neighbourhood scheme paused pending review

Enfield Council confirmed on 7 September 2026 that the Enfield Town Liveable Neighbourhood scheme has been paused pending a review. The decision means that the next phase of works, which includes new cycle lanes and pedestrian crossing relocations, is currently on hold. The scheme is funded by Transport for London (TfL), which has allocated £3.65 million for the upcoming phase.

Concerns over scheme changes

Read Next in Barnet Press3 min read
Enfield schools face closure after £1.68m deficit

Enfield schools face closure after £1.68m deficit

Conservative council leader launches public consultation on the future of three primary and secondary schools.

The pause has raised concerns among local groups and councillors about potential changes to the scheme, particularly regarding the proposed cycle lanes. Enfield Conservatives, who now lead the council, had pledged in their election manifesto to remove cycle lanes in eastern Enfield. While not confirmed, it is suggested that cycle lanes planned for London Road and Cecil Road are among the aspects under reconsideration.

Sarah Jons, leader of the Green group on Enfield Council, stated that residents deserve to know the reasons for the pause, the potential costs, and whether external funding is at risk. She added that if parts of the scheme are being pulled, the council should be transparent about what residents will no longer receive. The scheme's aims included making Enfield Town easier to walk and cycle through, greener, safer, and less dominated by traffic.

TfL funding on hold

Related Borough Coverage3 min read
Councillor Yildiz lodges conduct complaint over vaccination comments

Councillor Yildiz lodges conduct complaint over vaccination comments

Green councillor Aziz Yildiz claims Labour's Alev Cazimoglu made inaccurate public accusations regarding his vaccination status.

A spokesperson for Transport for London confirmed that TfL is awaiting further details from Enfield Council before releasing funding for the next phase. The spokesperson noted that TfL has supported the development of the scheme, which aims to reduce road danger, ease congestion, and improve air quality. They added that the authority needs to ensure the proposals continue to deliver intended benefits for local people. TfL has previously withheld funding from other London councils, such as Tower Hamlets and Croydon, when schemes were not implemented or were scrapped after installation.

The previous Labour administration at Enfield Council had officially approved the works in February 2026, following confirmation of TfL's £3.65 million contribution. The planned works included changes to London Road, Genotin Road, and Cecil Road, a revamp of the area outside Enfield Town Station with new seating and planting, and new traffic restrictions for St Andrew's Road. New cycle lanes were planned for Southbury Road, Genotin Road, London Road, and Cecil Road.

Council response and next steps

An Enfield Council spokesperson stated that the project was paused in May to allow the new administration to be confirmed and for a review to take place. The review found that many elements, including public realm improvements and making roads safer, are strongly supported. However, the review also identified aspects of the design needing further consideration to ensure the next phase balances benefits for all users. Discussions with TfL are ongoing regarding the progression of the scheme and the delivery of the next phase. The council said no final decisions have been made and that further community engagement will be considered once the final scope is determined.

Alex Atherton, from Better Streets for Enfield, expressed the view that the scheme needs to be completed after a lengthy consultation process. He argued that finishing the scheme is vital to increase footfall in the town centre and benefit businesses, and that relinquishing TfL funding would be an unwise move for residents, potentially jeopardising other funding for school streets and pedestrian crossings.

Questions this report answers

+Why has the Enfield Town Liveable Neighbourhood scheme been paused?

Enfield Council has paused the scheme for a review to consider aspects of the design where further thought is needed. This pause allows the new council administration time to assess priorities and potential changes to the project.

+What is the funding situation for the next phase of the scheme?

The next phase of the Enfield Town Liveable Neighbourhood scheme is funded by Transport for London with an allocated £3.65 million. However, TfL has stated that it is awaiting further details from the council before releasing this funding.

+What specific works were planned for the next phase?

The planned works included new cycle lanes on London Road, Cecil Road, Genotin Road, and Southbury Road. Additionally, pedestrian crossing relocations and improvements to the area outside Enfield Town Station were part of the proposed next phase.

+What happens next with the Enfield Town Liveable Neighbourhood scheme?

Enfield Council is continuing discussions with Transport for London on how the scheme can progress. No final decisions have been made on the scope or delivery of the next phase, and further community engagement may be required once the scope is determined.

Barnet Press News Desk

This article was written at the Barnet Press news desk from the reporting of the outlets listed below it. Drafting is done by a language model under human editorial supervision — there is no reporter behind this byline, and we would rather say so than invent one.

How stories are produced and scoredWho runs Barnet PressCorrections

Live in the borough

Barnet conditions

Loading live conditions…

More Coverage in World

Enfield schools face closure after £1.68m deficit

Enfield schools face closure after £1.68m deficit

3 min read
Councillor Yildiz lodges conduct complaint over vaccination comments

Councillor Yildiz lodges conduct complaint over vaccination comments

3 min read
London Assembly Pushes for TfL Control of Great Northern Rail

London Assembly Pushes for TfL Control of Great Northern Rail

3 min read
Labour forecast to win up to 60 London seats, poll shows strong swing in Barnet

Labour forecast to win up to 60 London seats, poll shows strong swing in Barnet

3 min read

Who else reported this

Our article above is written from the facts in these reports. Read the originals — every one is linked.

Enfield Town Liveable Neighbourhood | Barnet Press